John Lawrie Tubulars provided 36no. 339mm dia thick-walled steel tubular bearing piles for the project. Using John Lawrie Tubulars’ repurposed tubular products and bespoke procedures saved this project 258.05 tCO₂e.
Piling for Warehouse Infrastructure
JLT_CT2025-08-12T13:18:50+00:006,872.37 mtrs of Steel Piles installed for foundations in Northampton, our products and procedures saved this project 1575.42 tonnes of CO₂e.
Piling for Wind Farm Foundations
JLT_CT2025-09-02T11:04:06+00:002650.66 mtrs of 273mm Dia Steel Piling Supplied for Tacher Wind Farm, Wick. Using John Lawrie Tubulars’ repurposed tubular products and bespoke procedures saved this project 475.99 tonnes CO₂e!
Abbey Lane, Edinburgh
JLT_CT2025-08-12T13:17:47+00:00Over 550 Steel Tubular piles for 3 new blocks of flats constructed in Abbey Lane, Edinburgh. Using John Lawrie Tubulars’ repurposed tubular products and bespoke procedures saved this project 1132.24 tonnes CO₂e.
Downham Market
JLT_CT2025-08-12T13:17:33+00:00John Lawrie Tubulars provided 140mm diameter steel tubes in various lengths which were jointed together, providing a piling solution for 29 residential plots at their new Downham Market development in Norfolk
Baytree Nuneaton
JLT_CT2025-05-28T08:20:20+00:00Balfour Beatty Ground Engineering was contracted by Glencar Construction Ltd for the piling work at their Baytree Nuneaton project site in Warwickshire.
Montrose Port Authority
JLT_CT2024-12-16T11:06:25+00:00We supported piling phases one and two on a multimillion pound redevelopment project at Montrose Port.
The Event Complex Aberdeen
JLT_CT2024-04-29T09:45:20+00:00The P&J Live Arena, Aberdeen’s state-of-the-art conference, exhibition and entertainment complex opened in 2019, boasts foundations made from oil and gas pipe and casing which have been repurposed and reused into piling posts.