John Lawrie Tubulars provided 36no. 339mm dia thick-walled steel tubular bearing piles for the project. Using John Lawrie Tubulars’ repurposed tubular products and bespoke procedures saved this project 258.05 tCO₂e.
Steel Tubulars for Yarm Viaduct
JLT_CT2025-09-02T11:20:08+00:005850.5m Steel Tubular piles Supplied to support the existing Grade II listed Yarm Viaduct. Using John Lawrie Tubulars’ repurposed tubular products and bespoke procedures saved this project 555.54 tonnes CO₂e.
Kexby Old Bridge Stabilisation
JLT_CT2023-09-04T12:51:16+00:00Ivor King, one of the UK’s leading sheet piling and bored piling contractors, was contracted to install piling to assist with the structural stability of a Grade II listed bridge near York which dated back to 1650.
Montrose Port Authority
JLT_CT2024-12-16T11:06:25+00:00We supported piling phases one and two on a multimillion pound redevelopment project at Montrose Port.