6,872.37 mtrs of Steel Piles installed for foundations in Northampton, our products and procedures saved this project 1575.42 tonnes of CO₂e.
Landfill Drilling
JLT_CT2025-09-15T09:18:52+00:00Land drilling services drill boreholes on landfill sites for gas and leachate extraction throughout the UK. During drilling operations they use steel casing to stop the ground collapsing.
Liberty Care Home
JLT_CT2024-04-29T09:47:36+00:00We supported our long-standing client, Van Elle, with the supply of steel tubulars for piling for the building of a 72-bedroom, 3-storey care home inStoke-On-Trent, Staffordshire.
Baytree Nuneaton
JLT_CT2025-05-28T08:20:20+00:00Balfour Beatty Ground Engineering was contracted by Glencar Construction Ltd for the piling work at their Baytree Nuneaton project site in Warwickshire.
Redbridge Park & Ride
JLT_CT2024-04-29T09:43:12+00:00Akela Ground Engineering was contracted by ACS Construction for the piling work at Redbridge Park & Ride charging hub on behalf of Dutch company Fastned.
Broom Close Embankment
JLT_CT2025-06-02T09:45:54+00:00For this bank stabilisation project, we supplied 117 No. 339mm diameter Grade L80 steel Circular Hollow Section (CHS) piles which were cut to length and supplied from our Montrose facility.
The Event Complex Aberdeen
JLT_CT2024-04-29T09:45:20+00:00The P&J Live Arena, Aberdeen’s state-of-the-art conference, exhibition and entertainment complex opened in 2019, boasts foundations made from oil and gas pipe and casing which have been repurposed and reused into piling posts.