STORY CONTRACTING LTD

Broom Close Embankment

Broom Close Embankment

SUPPLY OF STEEL CASING FOR this bank stabilisation project

Project Summary

For this bank stabilisation project, we supplied 117 No. 339mm diameter Grade L80 steel Circular Hollow Section (CHS) piles which were cut to length and supplied from our Montrose facility.

Story Contracting Ltd installed the piles using their T10,000 RRV Colmar’s with a Movax attachment in 6 and 7.5 metre lengths to allow for varying ground conditions, with pile centres every 2 metres. Steel plates have also been welded between each pile to act as ballast retention to prevent future embankment failure.

Repurposing used oil and gas tubulars as piling is an economical as well as environmentally friendly option for construction projects from residential construction to large-scale infrastructure projects.

Highlights

Client Story Contracting Ltd
Location Broom Close Embankment, Birmingham
Project Supply of steel tubulars for steel piling
Casing Pipe 339mm diameter Grade L80 steel Circular Hollow Section (CHS) piles
C02 Saving