Piling for Warehouse Infrastructure

Piling Installed for Warehouse Infrastructure in Northampton

  • Piling for Warehouse Infrastructure

6,872.37 Mtrs of Steel Piles supports the expansion of warehouse infrastructure in Northampton

Using John Lawrie Tubulars’ repurposed tubular products and bespoke procedures saved this project 1575.42 tonnes CO2e. That’s a 97.21% saving over the production of new prime steel products.

Project Summary

John Lawrie Tubulars supplied 339mm OD and 244.5mm OD steel piles to Aarsleff Ground Engineering for installation. The piles were installed as foundations for a distribution warehouse in Northampton.

Project Challenges

The project utilised upto 4nr piling rigs to be able to deliver the installation within a challenging 11 week timeframe. John Lawrie Tubulars helped us overcome programme constraints by supplying the required steel quantities at short notice to deliver the project on time.

The majority of the site was precast piles however steel tubular piles were used for braced bay locations as the building loads in the braced bay positions exceeded the precast pile capabilities and therefore steel tubes had to be utilised for these sections.

Client Comments

“By working with John Lawries, we are able to offer a significantly lower embodied carbon product to our clients. This means that we are able to achieve much higher reductions against their baselines and contribute to their sustainability goals and accreditations. This helps to improve our reputation with the client and deliver on our own carbon reduction targets”  Aarsleff Ground Engineering

ClientAarsleff Ground Engineering
LocationNorthampton, England
ProjectWarehouse Infrastructure
Product6872.37mtrs of Steel Tubulars (339mm OD &244.5mm OD)
C02 Saving1575.42 tCO2e
  • Quick Contact

Name*