Endformedᵀᴹ Helical Piling for Telecoms

Endformedᵀᴹ Helical Piling Installed at Aston on Trent, Derby

  • Piling for Telecoms
  • Helical Piles and Square Hats for Telecoms Mast

177.8mm Dia Galvanised Steel Helical Endformedᵀᴹ Piles with Square hats for Telecoms installation.

Using John Lawrie Tubulars’ repurposed tubular products and bespoke procedures saved this project 5.80 tonnes of CO2e. That’s a 97.21% saving over the production of new prime steel products.

Project Summary

John Lawrie Tubulars supplied 177.8 mm Helical Piles, Square Top Hats and a customised Drive Head. The products were extended using our next generation EndformedTM connection system and galvanised ready to be installed as foundations for a telecoms mast.

Project Challenges

Our client was approached to design and install a steel pile foundation for a new telecoms mast, in Derby. Due to ground conditions and high water table they opted for a steel grillage.

They confirmed that our ability to fabricate the Top Hats for the grillage meant these pieced together well and no design clashes being from different fabricators.

Client Comments

“Dealing with John Lawrie Tubulars is always straight forward. They understand our needs and give us confidence that all orders meet the specification. In addition, our clients score us on our environmental impact so it makes perfect sense to use sustainable products.  John Lawrie Tubulars helps us lower our environmental impact” CGS Construction

ClientCGS Construction
LocationDerby, England
ProjectTelecoms Mast, Aston on Trent
Product177.8 mm Helical Piles (2m & 3m), Square Top Hats and a Drive Head
C02 Saving5.08 tCO2e